STUDIES UNDER CONSIDERATION
·      Major Water System Enhancements  (Preliminary)
Estimated Cost: $250,000 Water Tank North Shore
$250,000 Elevated Increased Storage
$140,000 Computerized Touch/Read Water Management System
·      Water Loop North Shore to South Shore (Preliminary)
Estimated Cost:  $200,000
·      Water Rights Capacity Analysis  (Complete)
·      Pump Station Enhancement  (Action 2012)
Estimated Cost:  $30,000
·      Vehicle Control at Main Entrance  (Complete)