| STUDIES UNDER CONSIDERATION | ||||||||||
| · Major Water System Enhancements (Preliminary) | ||||||||||
| Estimated C | $250,000 Water Tank North Shore | |||||||||
| $250,000 Elevated Increased Storage | ||||||||||
| $140,000 Computerized Touch/Read Water Management System | ||||||||||
| · Water Loop North Shore to South Shore (Preliminary) | ||||||||||
| Estimated C | $200,000 | |||||||||
| · Water Rights Capacity Analysis (Complete) | ||||||||||
| · Pump Station Enhancement (Action 2012) | ||||||||||
| Estimated Cost: $30,000 | ||||||||||
| · Vehicle Control at Main Entrance (Complete) | ||||||||||